{"id":642,"date":"2021-04-06T14:26:35","date_gmt":"2021-04-06T14:26:35","guid":{"rendered":"https:\/\/greenwayoman.com\/?page_id=642"},"modified":"2021-04-07T05:55:38","modified_gmt":"2021-04-07T05:55:38","slug":"pioneer-projects","status":"publish","type":"page","link":"https:\/\/greenwayoman.com\/major-projects\/pioneer-projects\/","title":{"rendered":"Pioneer Projects"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t

Pioneer Projects<\/h3>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t\t\t\t\t\t\t\"Arrow\"\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t
<\/div>
SL.NO <\/th>PROJECT <\/th>SCOPE <\/th>MAIN CONTRACTOR <\/th>CLIENT <\/th><\/tr><\/thead>
1 <\/td>Construction of Royal Opera House, Qurum <\/td>Circuit wiring for Production Lighting, containments, cabling & Termination works <\/td>Carillion Alawi <\/td>Royal Court of Affairs <\/td><\/tr>
2 <\/td>ENGINEER 3 PROJECT \u2013 MCC at AL Mazyunah, SCC at Tusnat and 10 Nos Surveillance Centres <\/td>All associated Mechanical, Electrical, Plumbing, Firefighting and HVAC works <\/td>C &C Oman LLC <\/td>Royal Army of Oman <\/td><\/tr>
3 <\/td>Construction of Sohar Airport Pckg 2: Airfield Infrastructure works <\/td>Installation of Electromechanical works related to Fuel Farming Facility <\/td>Strabag Oman LLC <\/td>Ministry of Transport & Communications <\/td><\/tr>
4 <\/td>Construction of Al Duqm Airport Pckg 2: Airfield Infrastructure works <\/td>Installation of Electromechanical works related to Fuel Farming Facility <\/td>Hanjin Industries & Construction Co. Ltd <\/td>Ministry of Transport & Communications <\/td><\/tr>
5 <\/td>Construction of East Hangar Facility @ Al Mussanah <\/td>Airfield Lighting Installation at the Apron area. Electrical & Plumbing works at East Hangar facility <\/td>CDM \/ CAPE JV <\/td>US Army Corps of Engineers Middle East District <\/td><\/tr>
6 <\/td>Lights for Horse Race Track @ Royal Cavalry, Seeb <\/td>Installation of high mast lighting (40M & 25M) for horse race track <\/td>International Electrical Company <\/td>Royal Court of Affairs <\/td><\/tr>
7 <\/td>Lightning Protection System for OCEC Package 2 <\/td>Design, Supply, Installation, Testing & Commissioning of Advanced Lightning Protection System (LPI, Australia) at the Oman Convention & Exhibition Centre <\/td>Carillion Alawi <\/td>Oman Tourism Development Company (OMRAN) <\/td><\/tr><\/tbody><\/table><\/div><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"

Pioneer Projects<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":281,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-inner.php","meta":{"footnotes":""},"class_list":["post-642","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/pages\/642","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/comments?post=642"}],"version-history":[{"count":4,"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/pages\/642\/revisions"}],"predecessor-version":[{"id":653,"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/pages\/642\/revisions\/653"}],"up":[{"embeddable":true,"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/pages\/281"}],"wp:attachment":[{"href":"https:\/\/greenwayoman.com\/wp-json\/wp\/v2\/media?parent=642"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}